| Commercial Office Projects | |||||||||||||||||||||||||||||||||||
|
|
Washington
Mutual Center Seattle, Washington |
||||||||||||||||||||||||||||||||||
|
The 42-story Washington Mutual - Seattle Art Museum project is the newest highlight to the beautiful Seattle skyline. This joint venture between WAMU and SAM adds over 300,000 square feet to the museum, over 12 full and partial floors, and over 900,000 square feet of new WAMU office space throughout nearly all 42 stories. In addition, the office tower sits atop 6 stories of parking that accommodate over 700 vehicles. The Washington Mutual Center Alerton DDC system not only controls the heating, ventilation, and air conditioning systems, but also manages the engineered emergency smoke control system and is the center point for integrating other building operation systems within the facility. Project Control Highlights:
Project Alerton Integration Highlights:
|
|||||||||||||||||||||||||||||||||||
|
|
Bank
of America Tower |
||||||||||||||||||||||||||||||||||
|
The Bank of America Tower is one of America's largest commercial office building DDC control systems. It is the tallest building in the Pacific Northwest, standing at 76 stories, with over 1,500,000 square feet of space.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
Rainier
Plaza Bellevue, Washington |
||||||||||||||||||||||||||||||||||
| The
Rainier Plaza is one of the largest high-rise buildings in downtown Bellevue,
Washington. Including the 5 level parking garage, it is 24 stories tall
and encompasses 431,000 square feet. The building includes both office and
retail space. The legacy building controls system was retrofitted with Alerton's
totally native BACnet system, BACtalk®.
|
|||||||||||||||||||||||||||||||||||
|
|
Fisher
Plaza Seattle, Washington |
||||||||||||||||||||||||||||||||||
| Fisher
Plaza, owned, operated and developed by Fisher Communication, is a media,
communications and mission critical facility. With two buildings totaling
300,000 square feet, Fisher Plaza provides commercial space specializing
in maintaining and supporting crucial operations. The HVAC system for Fisher
Plaza is cutting edge and state-of-the-art. The building utilizes raised
floors to provide the first underfloor HVAC system in the area. This system,
along with de-mountable walls and modular furniture systems, offers ultimate
flexibility and minimizes the time to modify or bring a space into functional
use.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
![]() |
![]() |
|||||||||||||||||||||||||||||||||
| Plaza 600 Bldg. | Lloyd Bldg. | Times Square Bldg. | |||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||
| Tower Bldg. | Roffe Bldg. | ||||||||||||||||||||||||||||||||||
|
Vance
Corporation Buildings
|
|||||||||||||||||||||||||||||||||||
| These
five buildings represent part of the fleet of Vance Corporation buildings
located throughout Seattle. From a VAV system in the Roffe building to a
steam heat system in the Plaza 600 building, ATS has been able to create
flexible and economical solutions for the Vance Corporation. Because many
of downtown Seattle's buildings are almost 100 years old, retrofitting the
HVAC and controls systems is essential to maintain use of these prime real-estate
complexes.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
| K-12 Projects | |||||||||||||||||||||||||||||||||||
|
|
Arlington
High School Arlington, Washington |
||||||||||||||||||||||||||||||||||
| A
full Alerton BACtalk control system was implemented in the newly constructed
Arlington High School. From Carbon Dioxide monitoring to Kitchen Cooler
and Freezer temperature control, ATS engineered a system that could go beyond
traditional HVAC controls.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Mercer
Island |
||||||||||||||||||||||||||||||||||
| ATS
Automation installed a complete Alerton IBEX control system in the newly
constructed Mercer Island High School.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Kent
School District Kentlake Senior High School Kent, Washington |
||||||||||||||||||||||||||||||||||
|
This IBEX System monitors and controls various hydronic heat pumps, boilers, and a fluid cooler. The system also contains a variable speed pumping system and a gas-fired heating system. Also connected to the control system are irrigation, lighting and fume hood control. This facility also has the ability to monitor power, assess damage control and monitor and protect phase failure. Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||
|
|
Central
Washington University Ellensburg, Washington |
||||||||||||||||||||||||||||||||||
|
The fastest growing four-year public university in Washington, Central Washington University (CWU) is recognized for outstanding academics, small classes and an ideal location, just east of the Cascade Mountains. During the past 6 years, ATS has installed Alerton BACtalk controls in approximately 30 buildings on the CWU campus. There are a variety of HVAC systems controlled by Alerton throughout the campus with numerous operator workstations scattered across the campus network. Alerton controls are installed in the boiler and chiller plants, the new Science Building, the new Music Building, and many other classroom buildings and residence halls. Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
University
of Washington Seattle, Washington |
||||||||||||||||||||||||||||||||||
|
The University of Washington was founded November 4, 1861, making it the oldest public university on the west coast. The UW is a public research university, with 218 buildings spanning 693 acres. ATS has created a strong presence over the last 20 years throughout the campus. From economical VAV systems to advanced laboratory ventilation systems, ATS has engineered and installed control systems in buildings such as Suzzallo Library, Allen Library, Henry Art Gallery, Fisheries Building, Teaching Center, Faculty Building, and the H and K wings.
|
|||||||||||||||||||||||||||||||||||
|
Project Highlights
|
|
||||||||||||||||||||||||||||||||||
|
|
Yakima
Valley |
||||||||||||||||||||||||||||||||||
| Yakima
Valley Community College (YVCC) has transformed much of its campus into
Alerton IBEX. ATS has installed DDC controls in fourteen buildings on campus,
which are all networked together and accessible on location or from one
of two main workstations on campus. From Boiler and Chiller operations to
irrigation and lighting control, ATS has been working with YVCC for over
13 years to create a more efficient and manageable campus wide HVAC system.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Whatcom
Community College Bellingham, Washington |
||||||||||||||||||||||||||||||||||
|
Whatcom Community College is a public community college serving an average of 7,000 students a quarter. Alerton Controls can be found in approximately half of the campus. This includes the Laidlaw Building, Heiner Building, Student Center and the new Science Hall, which also utilizes Phoenix Lab controls. Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Eastern
Washington University Cheney, WA |
||||||||||||||||||||||||||||||||||
| Established
in 1882, Eastern Washington University has a student enrollment of over
9,000 students.
ATS Inland NW continues to work with EWU Facilities personnel and preferred contractors to provide energy related improvements to all 53 of the existing campus facilities. Alerton BACtalk controls have been installed in multiple buildings providing control and monitoring for over 200,000 square feet of existing facilities. The native BACnet Alerton BACtalk control system has been integrated to the existing BACnet control system using the available campus-wide network. EWU consistently relies on the Alerton WEBtalk Operators interface to access their control system from multiple remote locations via the Internet. Project Highlights
|
|||||||||||||||||||||||||||||||||||
| Government: | |||||||||||||||||||||||||||||||||||
|
|
Puget
Sound Naval Shipyard & Naval Base Kitsap - Bremerton Bremerton, Washington |
||||||||||||||||||||||||||||||||||
|
PSNS is the largest Naval shore facility and one of Washington State's largest industrial installations adjacent to Naval Base Kitsap at Bremerton. NBK Bremerton provides world-class facilities, programs, and services to support and improve personnel and logistics readiness. Currently, ATS is installing Alerton BACtalk controls in approximately 57 buildings ranging from industrial production facilities to commercial office buildings to residential quarters. Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Space
Needle Seattle, Washington |
||||||||||||||||||||||||||||||||||
| The
Space Needle, towering 605 feet tall, is Seattle's most recognized landmark.
This unique building utilizes Alerton's Envision for IBEX energy management
system to keep thousands of tourists comfortable every year.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Department
of Ecology Lacey, Washington |
||||||||||||||||||||||||||||||||||
| The
Department of Ecology headquarters is home to over 1200 state employees.
Recently, the DOE headquarters underwent a massive retrofit of the buildings'
HVAC system. In three months, ATS installed a complete BACtalk controls
system with Carbon Dioxide sensing, humidity and pressure control, and a
fire alarm interface. Not only was all work completed during after-hours,
but also the project was done in a fully occupied building with no system
down time during the day.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
| Industrial: | |||||||||||||||||||||||||||||||||||
|
|
Boeing
Auburn Site Auburn, Washington |
||||||||||||||||||||||||||||||||||
| Boeing
Auburn Site exclusively uses the Alerton IBEX control system to manage 18
buildings over 516 acres of plant area. With over 4 million square feet
of office and manufacturing space, Boeing uses the Alerton system for temperature
control, energy savings, demand limiting, and curtailment. Boeing Auburn
saved $1.5 million in energy costs in a single year after implementing Alerton
energy management sequences.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||
|
|
Marriott
Waterfront Seattle, Washington |
||||||||||||||||||||||||||||||||||
| ATS
Automation recently completed a full BACtalk system in the Marriott Waterfront
hotel. This 325,000 square foot, 8-story building accommodates one of Seattle's
premiere full-service hotels.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Pro
Sports Club Bellevue, Washington |
||||||||||||||||||||||||||||||||||
| With
over 35,000 members, Pro Sports Club in Bellevue is the largest health club
in the nation. At 260,000 square feet, the building consists of 4 basketball
courts, 4 swimming pools, 9 squash courts, 6 indoor tennis courts, spa,
auditorium and meeting rooms. From sauna rooms to tennis courts, the Pro
Sports Club must maintain a quality comfort level in various environments.
They chose the ATS solution partly because of its energy saving programs
and easy equipment time scheduling.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Hotel
Monaco Seattle, Washington |
||||||||||||||||||||||||||||||||||
| This
189-room hotel with over 6,000 square feet of meeting space utilizes the
Alerton IBEX control system. Because conference rooms can fill up in a matter
of minutes, Hotel Monaco chose the reliable and advanced ATS solution to
ensure the comfort of their guests.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||
|
|
VA
Hospital Seattle, Washington |
||||||||||||||||||||||||||||||||||
|
VA Puget Sound Seattle Campus makes up the largest VA facility in the region, providing annual care to more than 46,000 veterans. In addition, VA Puget Sound hosts the most comprehensive research program in Washington State, as well as animal and infectious disease research. Being a diverse facility, VA chose the ATS solution because of its flexibility and variable control system. Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Seattle
Crime Lab Seattle, Washington |
||||||||||||||||||||||||||||||||||
| The
Washington State Patrol Seattle Crime Lab, the state's largest lab for DNA
and forensics, recently underwent a major tenant improvement on two floors
of the city-owned building. The work included lab casework, hoods, and extensive
central and tenant HVAC improvements. Alerton's BACtalk system, Phoenix
Controls and Strobic Fans work together to maintain proper working and lab
conditions in this approximately 46,000 square foot facility. Three Strobic
Exhaust Fans were installed on a single plenum serving fume hood exhaust.
The fans offer higher effective stack height and increased dilution with
lower stack height and lower energy costs. Similarly, Phoenix Zone Presence
Sensors were used to reduce the fume hood airflow when hoods were left open
in an unoccupied space.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Seattle
Pacific University Science Building |
||||||||||||||||||||||||||||||||||
| Seattle
Pacific University (SPU) was established more than a century ago by Free
Methodist pioneers; SPU is a comprehensive Christian university of the liberal
arts, sciences and professions. The new Science facility was built as a
teaching and lab building with Phoenix lab controls and Alerton BACtalk
DDC controls. Alerton Controls are also installed in Marston and Watson
Halls with a DDC control interface at the Greenhouse.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Whitman
Science Building |
||||||||||||||||||||||||||||||||||
| Whitman
recently completed the new $13 million 105,000 square foot Hall of Science.
The new building provides a wireless network for Internet access, more student/faculty
research labs, and enhanced classroom space. This large Phoenix project
necessitated installing a BACnet interface to the Automated Logic DDC system. Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
Central
Washington Science Hall Ellensburg, Washington |
||||||||||||||||||||||||||||||||||
| With
an increasing student population, Central Washington University constructed
a new, state-of-the-art science building. The building is furnished with
both Alerton controls and Phoenix Laboratory Controls to provide an ideal
class and laboratory environment.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
AMGEN/
Helix site Seattle, Washington |
||||||||||||||||||||||||||||||||||
| At
860,000 square feet, the AMGEN Helix site was one of ATS Automation's largest
Phoenix Control installations. As a research and test facility, the building
required the precise, accurate and safe laboratory airflow of Phoenix Controls.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
307
Westlake Seattle, Washington |
||||||||||||||||||||||||||||||||||
| This
five-story 112,000 square foot state-of-the-art biomedical research facility
is composed of numerous wet labs, clinic lab spaces and office support spaces.
Located in South Lake Union, the building houses the Seattle Biomedical
Research Institute, Children's Hospital Research and other research groups
that demand critical environments and a cutting edge HVAC system.
Project Highlights
|
|||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||