Education Projects

Other Examples of our Higher Educational clients include:

  • University of WA
  • Shoreline CC
  • Bellevue College
  • Lake WA Technical College
  • Seattle Pacific University
  • UW Tacoma
  • Pacific Lutheran University
  • Edmonds CC

Enatai Elementary

Location: Bellevue, WA

Bellevue School District Modernization Plan

Enatai Project StatsStarting in 2002, the Bellevue School District (BSD) began replacing and updating schools that no longer met the needs of their growing community. BSD’s goal with each new school is to exceed energy design requirements as defined by the 2012 International Energy Code. As of 2018, BSD has replaced 18 schools with state of the art facilities that incorporate the latest educational designs and technology to ensure students and teachers have an ideal learning environment. By making each new school as energy efficient as possible, BSD is ensuring they are maximizing their capital dollars which will allow them to make the best use of their general funds. In 2015, as part of the ongoing modernization projects, Enatai Elementary was demolished to make way for an updated facility that will host elementary students well into the future.

Unified Lighting and HVAC Control

BSD is determined to improve upon school designs with each facility replacement. When planning for the new Enatai, BSD decided their next improvement would be to house as many of their controlled systems under one platform as possible. Having worked with ATS Automation for many years, BSD was familiar with the environmental controls provided by the Alerton building management system (BMS) from their other schools. Once ATS demonstrated that they could efficiently control the HVAC equipment and also incorporate all the lighting into the same BMS, BSD chose ATS to provide the HVAC and lighting controls for the Enatai facility. By selecting one vendor, staff at Enatai have access to ATS’ expertise for both HVAC and lighting during the original installation and for long-term service. Now Enatai has one point of contact when it comes to the controls for their school — simplifying maintenance and operations.

To integrate HVAC and lighting, ATS designed a system utilizing Alerton’s Compass BMS and Blue Ridge Technologies’ (BRT) lighting control platform. Alerton and BRT combined provide integrated lighting control without the use of proprietary gateways. Utilizing BACnet, BRT controllers are easily added to the Alerton BMS without needing any integration device. This solution allows BSD operators to use the same schedules for both HVAC equipment and lighting without the need to duplicate work in a separate lighting interface.  ATS programmed a global schedule for lighting at Enatai in conjunction with BRT monitoring classrooms and common areas using occupancy sensors and photo cells. The sensors are used for daylight harvesting and turnoff or dim lighting according to lumen levels and whether the area is occupied or not. Classroom lighting control features a traditional on/off switch in the front of all classrooms, as well as a separate adjustment panel near the teachers’ desks.

Impact on Energy & Operations

By combining environmental and lighting controls, BSD has ensured that their high efficiency designs and equipment will continue to save the school money throughout the life of the building. “The strategy is that on day one the facility is already saving on utility bills,” said Jeff Tweeten, HVAC/Utilities Control Specialist for the Bellevue School District, “by saving on day one, the measured benefits are all about the efficiencies that directly impact the learning environment.” With integrated lighting, Jeff and his team can focus on what really matters  — ensuring the learning environment is optimal for both students and teachers.

The new Enatai Elementary nearly doubled the size of the original school to 87,500 square feet. The school opened to the public in September of 2016 with over 500 students attending class during the academic year. The school also received $135,013 in utility incentives by Puget Sound Energy (PSE) for exceeding local energy code efficiency requirements and standard practices during construction.

In addition to lighting and environmental controls, the new Enatai elementary school features other energy efficient technology, such as geothermal heating and cooling, solar panels, heat recovery, AstroTurf, solar hot water loop and high efficiency sequences for mechanical equipment. Utilizing solar panels, Enatai recovers approximately 90,000 kWh per year. This harvested energy covers the majority of the school’s lighting cost for the year. Enatai’s energy use index (EUI) was also significantly improved from the previous facility. The school’s combined electric and natural gas EUI is currently 17 and is expected to decrease as system tuning continues. The national median source EUI for K-12 schools is 141. ATS, along with Alerton and BRT, help Enatai maintain optimal performance with rock solid building controls and sequences, along with occupancy-based lighting usage and daylight harvesting.

For additional details read the entire case study detailing the work performed at Enatai Elementary.

Download the full case study.

 

 

Bainbridge High School

Client: Bainbridge Island School District
Location: Bainbridge Island, WA

By having ATS install and integrate new boiler control into the existing Alerton building automation system, Bainbridge High School reestablished control over their boiler plant while leveraging their existing control system and extensive control knowledge of ATS engineers.

The boiler control project was completed over the summer of 2014. When comparing the high school’s utility cost from 2014 to that of 2015 there was a 36% decrease in spend. This decrease was equivalent to $267,540 in utility savings that was put back into the District’s general fund. In addition to reduced spending, equipment runtime decreased by 42% when comparing the winter months of 2014 to 2015.

Download Full Case Study

Renton High School

Client: Renton School District
Location: Renton, WA

Located in downtown Renton, WA, the historic Renton High School (RHS) was originally built in 1911. The initial building was later demolished to make room for an updated school with improvements and additional space for the increasing population of the area. Over its 105-year history the high school has been rebuilt and expanded upon many times. The latest improvements began in 2013 with a complete controls retrofit of the RHS Campus, including the entire mechanical system.

A Direct Digital Control (DDC) system was originally installed at RHS in 2000, and then updated in 2010. The District was never completely satisfied with the operation of the system or the support they received from the original installer. Within three months of operation the District switched to manual boiler control due to ongoing issues with the boiler control interface. Although it was being controlled manually, the staff knew the boiler and the rest of the school was operating inefficiently. In order to address the issue, the District, working with a local energy service company (ESCO), approached ATS to perform a complete DDC retrofit at the RHS.

Download Full Case Study

Central Washington University

Client: CWU
Location: Ellensburg, WA
Architect: Integrus
General Contractor: Lydig
Mechanical Contractor: Apollo

ATS has installed Alerton controls and Phoenix Air Valves throughout the campus over the past 20 years.

CWU depends upon their Alerton BACnet system to keep the nearly 11, 000 students safe and comfortable while maintaining building efficiency. The campus is located on 380 acres in Ellensburg, WA. We are currently working on their new Science Building which is due to open in 2015.

 

Tacoma School District

Location: Tacoma, WA

ATS has installed Alerton and Tridium based controls in several sites and on the following sustainable systems: Displacement Ventilation, Heat Recovery, Radiant Floors and Condensing Boilers.

Bellevue School District

Location: Bellevue, WA

ATS has worked with the district for more than 20 years and has installed Alerton controls in many of their schools and on the following sustainable systems: Displacement Ventilation, Heat Recovery, Radiant Floors and Condensing Boilers and Ground Source Heat Pumps.

Snohomish School District

Location: Snohomish, WA

ATS has worked with the district for more than 15 years and has installed Alerton controls in almost all of their schools and on the following sustainable systems: Displacement Ventilation, Heat Recovery, Radiant Floors and Condensing Boilers.