Call Us (425) 251-9680
Navigation

Education Projects

Other Examples of our Higher Educational clients include:

  • University of WA
  • Shoreline CC
  • Bellevue College
  • Lake WA Technical College
  • Seattle Pacific University
  • UW Tacoma
  • Pacific Lutheran University
  • Edmonds CC

Bainbridge High School

Client: Bainbridge Island School District
Location: Bainbridge Island, WA

By having ATS install and integrate new boiler control into the existing Alerton building automation system, Bainbridge High School reestablished control over their boiler plant while leveraging their existing control system and extensive control knowledge of ATS engineers.

The boiler control project was completed over the summer of 2014. When comparing the high school’s utility cost from 2014 to that of 2015 there was a 36% decrease in spend. This decrease was equivalent to $267,540 in utility savings that was put back into the District’s general fund. In addition to reduced spending, equipment runtime decreased by 42% when comparing the winter months of 2014 to 2015.

Download Full Case Study

Renton High School

Client: Renton School District
Location: Renton, WA

Located in downtown Renton, WA, the historic Renton High School (RHS) was originally built in 1911. The initial building was later demolished to make room for an updated school with improvements and additional space for the increasing population of the area. Over its 105-year history the high school has been rebuilt and expanded upon many times. The latest improvements began in 2013 with a complete controls retrofit of the RHS Campus, including the entire mechanical system.

A Direct Digital Control (DDC) system was originally installed at RHS in 2000, and then updated in 2010. The District was never completely satisfied with the operation of the system or the support they received from the original installer. Within three months of operation the District switched to manual boiler control due to ongoing issues with the boiler control interface. Although it was being controlled manually, the staff knew the boiler and the rest of the school was operating inefficiently. In order to address the issue, the District, working with a local energy service company (ESCO), approached ATS to perform a complete DDC retrofit at the RHS.

Download Full Case Study

Central Washington University

Client: CWU
Location: Ellensburg, WA
Architect: Integrus
General Contractor: Lydig
Mechanical Contractor: Apollo

ATS has installed Alerton controls and Phoenix Air Valves throughout the campus over the past 20 years.

CWU depends upon their Alerton BACnet system to keep the nearly 11, 000 students safe and comfortable while maintaining building efficiency. The campus is located on 380 acres in Ellensburg, WA. We are currently working on their new Science Building which is due to open in 2015.

 

Tacoma School District

Location: Tacoma, WA

ATS has installed Alerton and Tridium based controls in several sites and on the following sustainable systems: Displacement Ventilation, Heat Recovery, Radiant Floors and Condensing Boilers.

Bellevue School District

Location: Bellevue, WA

ATS has worked with the district for more than 20 years and has installed Alerton controls in many of their schools and on the following sustainable systems: Displacement Ventilation, Heat Recovery, Radiant Floors and Condensing Boilers and Ground Source Heat Pumps.

Snohomish School District

Location: Snohomish, WA

ATS has worked with the district for more than 15 years and has installed Alerton controls in almost all of their schools and on the following sustainable systems: Displacement Ventilation, Heat Recovery, Radiant Floors and Condensing Boilers.