By having ATS install and integrate new boiler control into the existing Alerton building automation system, Bainbridge High School reestablished control over their boiler plant while leveraging their existing control system and extensive control knowledge of ATS engineers.

The boiler control project was completed over the summer of 2014. When comparing the high school’s utility cost from 2014 to that of 2015 there was a 36% decrease in spend. This decrease was equivalent to $267,540 in utility savings that was put back into the District’s general fund. In addition to reduced spending, equipment runtime decreased by 42% when comparing the winter months of 2014 to 2015.