• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • RE-OPEN STRATEGIES
  • Careers
  • ATS Companies
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact
  • Search

ATS Automation

Smart Building Control Systems Serving Western and Central Washington

Building Solutions


  • Controls
  • Energy Optimization
  • Service
  • Home
  • About
    • ATS Companies
    • Vision & Values
    • Team
    • Community
    • Careers
    • Testimonials
  • Solutions
    • Construction
    • Energy Management
    • Smart Building Solutions
    • Consulting Services
  • Support
    • 24/7 Service
    • Service Programs
    • Training
    • Operational Tech
      • FacilityHost
      • FacilityShield
  • Projects
  • Products
  • Contact
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact
Eastridge Campus ATS Project

Eastridge Corporate Center

Location: Bellevue, WA
Client: The Morelli Family, LLC

Gaining Control of the Campus

Eastridge Case Study SavingsEastridge Corporate Center (ECC) in Bellevue, WA is owned and operated by The Morelli Family, LLC, and consists of two buildings with a combined square footage of 87,500. Constructed in 1982, the campus was primarily controlled by the original pneumatic system which was long past its end of life. Building staff was constantly adjusting the system trying to keep tenants happy. The two buildings were eventually forced to run 24/7 just to maintain tenant satisfaction.

Wanting to improve building performance, the owner contacted ATS to discuss maximizing their systems. The campus was experiencing numerous issues including: failing VAV boxes, faulty pneumatic controls, poor air quality and inconsistent temperatures.

ATS provided ECC with options to address the maintenance and comfort issues at the campus. There were two possible paths: a comprehensive systems replacement or piece-meal repairs. Puget Sound Energy’s (PSE) Major HVAC Controls Upgrade program provided incentives of up to 50% for the comprehensive system replacement. ATS guaranteed the incentives up-front and provided financing for the retrofit. The financing and incentives allowed the owner to modernize immediately rather than wait for a significant system failure. With guaranteed incentives and financing, capital was freed up for ECC to also perform a concurrent lighting retrofit.

Result

ECC has seen savings of 40% in total campus energy usage (667,000 kWh over 12 months) for the two ECC buildings combined. In addition, there was an avoided cost of $73,501 in utility spend over 12 months. As part of the financing agreement, ECC added an ongoing Support Agreement with ATS to ensure improvements in building operations are maintained into the future, further guaranteeing their investment and future savings. Tenant complaint calls have been significantly reduced now that ECC has greater visibility and control of their campus and an improved ability to solve issues in a timely and proactive manner.

For additional details read the entire case study detailing the work performed at the Eastridge Corporate Center.

Download Full Case Study

Eastridge Corporate Center Case Study

 

Footer

Featured Projects

Providence Regional Medical Center
Central Washington University
Hyatt Hotel and Olive 8 Residences

Seattle Area Office: 450 Shattuck Avenue South, Renton, WA 98057 • (425) 251-9680

Boise Office: 10951 W. Emerald Street, Boise, ID 83713 • (208) 887-9696

Centennial Office: 8200 S Akron Street, Ste. 117, Centennial, CO 80112 • (303) 799-1887

Anchorage Office: 139 E 51st Avenue, Anchorage, AK 99503 • (907) 868-5100

Spokane Office: 9507 E. Sprague, Spokane Valley, WA 99206 • (509) 892-1000

 

Top
Copyright © 2021 ATS Automation · All rights reserved. Website by Sundog Media, LLC Logo Sundog Media, LLC. · Privacy Policy · CCPA Policy